How to set up a work schedule for a project?

Updated over 3 weeks ago

To configure a work schedule, you first need to create at least one schedule.

Go to the project screen, open the “Schedules” tab, and tap the “+” button.

Then follow these steps:

Step 1. Select the days of the week for which you want to set working hours (by default, each day is considered a day off).

Step 2. Enter working hours and breaks.

Step 3. Save the settings for the selected days and, if needed, repeat the procedure for other days.

Step 4. Save the schedule.

Important

Created schedules can be used in any project — they are not tied to a single project. This allows you to create several schedule options and reuse or switch between them when needed.